FEC approves N80b for roads, $1.79b Abuja rail

Follow us on Social Media

Social sharing

The Federal Executive Council (FEC) on Wednesday approved N80 billion for the reconstruction of 12 federal roads across the country and simultaneously also approved contracts for roads and rail in Abuja metropolis.

Both the Minister of Power, Works and Housing, Mr Babatunde Fashola, and the Minister of the Federal Capital Territory, Muhammad Musa Bello disclosed this at the end of the Federal Executive Council (FEC) meeting, with  President Muhammadu Buhari presiding.

According to Fashola: “The first is the approval for the Engineering and Consultancy design for access roads 1 and 2 ‎to link Asaba in Delta State and Onitsha in Anambra State to the Second Niger Bridge project.

“Subsequent to the award of further works of the Second Niger Bridge we have started work now by this approval on the design of the link road that will connect the two states to the bridge.

“The design is expected to be completed in six months and we will start procurement and as the bridge advances we can then connect the two states. The contract sum is N150,840,000,’’ he said.

He said the other road projects approved across the states included the Numan, Jalingo roads connecting Adamawa‎ and Taraba states and the replacement of bridges at Mayanchi along Gusau-Sokoto road in Zamfara states.

READ ALSO  Senator Orji Kalu Congratulates Aide Sunny Idika On Birthday

According to the Minister, other roads approved for reconstruction by the council are in Bauchi, Plateau, Osun, Kwara, Oyo, Enugu, Kaduna and Kano.

Fashola disclosed that the council also approved the Power Sector Recovery Programme aimed at improving electricity in the country.

“It’s a programme that comprises many policy actions, operational and financial interventions that needs to be carried out by government to improve transparency, service delivery, performance of DISCOS, Transmissions companies, the entire value change in order to create more viable power sector that is private sector driven.’’

He said the council also approved the extension of the consultancy and project management contract for the Katsina Wind Energy Farm project.

The minister revealed that the extension was necessitated by challenges faced in the course of executing the project that was awarded in 2010 and expected to be completed in 2013.

“The expatriate implementing the project was kidnapped and when he was eventually rescued he never came back and that delayed the project. But we have revived the project; a new contracting team is back on site.

“The contract of the consultants representing us has expired and so we are extending his contract to cover new period of completion,’’ he said.

Similarly, FCT Minister Musa Bello revealed that the council approved three key infrastructure projects for the territory.

READ ALSO  Abba Moro Breaks Silence On Wike Giving Senators $2 Million

Bello stated that the approved projects included the procurement of 12 sets of train coaches to be used on the completed Lot 3 rail tracks.

He said Lot 3 will start from Abuja metro station through the Stadium, National Park, Ring Road 11 station, Idu station and will terminate at the airport.

He said the council  awarded contract for Phase 2 of the Abuja Mass Transit Lot 1B (26.77km) which is from Ring Road I, passing through Area 10 beside Wuse Market, Berger Junction, Jabi Motor Park, through Life Camp to Gwagwa.

According to him, the contract included the completion of the remaining part of Lot 1A (5.76km); Rolling stocks; workshop equipment and the three years Management contract.

He said the contract that was awarded to CCECC is funded by EXIM Bank at the cost of 1.79 billion dollars.

Bello said the council also approved contract for the continuation of infrastructural development of Jahi District at the cost of N19.473 billion

He said the council approved N2.4 billion for the construction of 3.5 kilometres road to link Ring Road III to Wasa Junction with Karshi -Ara-Apo Road in the FCT.

 

Source – NAN

Leave your comment on this post

THE ROTTEN FISH: CAN OF WORMS OPENED OF APC & TINUBU'S GOVERNMENT OVER NIGERIA'S ECONOMIC DOWNTURN

WATCH THE CRITICAL ANALYSIS AND KNOW THE RESPONSIBLE PARTIES TO BLAME FOR NIGERIA'S ECONOMIC CHALLENGES, WHILE CITIZENS ENDURE SEVERE HARDSHIPS.
READ ALSO  Confusion As Osun's Two First Ladies Welcome Remi Tinubu (Photos)

Watch this episode of ISSUES IN THE NEWS on 9News Nigeria featuring Peter Obi's Special Adviser, Dr Katch Ononuju, 9News Nigeria Publisher, Obinna Ejianya and Tinubu Support Group Leader, McHezekiah Eherechi

The economic crisis and hardship in Nigeria are parts of the discussion.


Watch, leave your comments, and share to create more awareness on this issue.


#9NewsNigeria #Nigeria #issuesInTheNews #politics #tinubu THE ROTTEN FISH: CAN OF WORMS OPENED ...
DON'T FORGET TO SUBSCRIBE AND LEAVE YOUR COMMENTS FOR SUBSEQUENT UPDATES
#9newsnigeria #economia #economy #nigeria #government @9newsng
www.9newsng.com

Leave your comment

Click on the link below or Scan the QR Code to join the 9News Nigeria WhatsApp Channel

9News Nigeria Investigative Reports WhatsApp Channel
9News Nigeria Investigative Reports WhatsApp Channel

Be the first to comment

Leave a Reply